Wire And Gas Combinations; Different Pulsing Methods; Wire Feed Unit - ESAB Aristo U82 Instruction Manual

Hide thumbs Also See for Aristo U82:
Table of Contents

Advertisement

4 MIG/MAG WELDING
primary phase time, the process immediately switches to secondary data. Weld completion is
based on secondary data.
4.3.1

Wire and gas combinations

For wire and gas combinations, see the "WIRE AND GAS DIMENSIONS" appendix at the
end of this manual.
4.3.2

Different pulsing methods

Below, you can see which pulsing method can be used, depending on the plate thickness to
be welded.
 
 Heat
A = Pulsing in primary phase and short arc in secondary phase
B = Pulsing in primary phase and pulsing in secondary phase
C = Spray in primary phase and pulsing in secondary phase
 
4.3.3

Wire feed unit

Precautionary measures!
When using SuperPulse, there is a considerable load on the wire feed unit. To avoid
endangering the functional safety of the wire feed unit, follow the limit values in the following
diagram.
0460 896 601
- 33 -
Plate dimension
 
© ESAB AB 2019

Advertisement

Table of Contents
loading

Table of Contents