Section 2 - Operation
Back Side (Continued)
No.
Label Pictorial
7
8
9
10
11
SKYJACK, Page 74
Labels and Nameplates - Models 3215 & 3219
9
10
11
Winching/Towing/Pushing Procedure
Winching/towing/pushing procedure. Ensure brake is released
and free-wheeling valve is open before moving the unit
manually.
Main Power Disconnect
Rotate clockwise to turn on main power; rotate
counterclockwise to turn off main power; insert padlock to lock
in position.
Hazard Identification
Read and understand the outlined risks associated with this
work platform prior to operation.
Manual Storage Box
Indicates location of operating manual.
Platform Capacity*
Rated work load in each configuration is as shown. Rated
work load includes the weight of both personnel and material.
Maximum number of people in each configuration is as shown.
Do not exceed total weight or maximum number of people.
Load platform uniformly.
*Platform capacity varies over different aerial platforms.
February 2008
11
8
7
Description
SJIII Compacts & Conventionals
Labels