7
|
Unit installation
7.3.5 To provide drainage
Installer reference guide
78
±150
kg
2 Fix the unit to the installation structure.
3 Remove the slings (and screws), and dispose of them.
▪
Make sure that condensation water can be evacuated properly.
▪
Install the unit on a base to make sure that there is proper drainage in order to
avoid ice accumulation.
▪
Prepare a water drainage channel around the foundation to drain waste water
away from the unit.
4×
4× M12
4×
EPRA14~18DAV3+W1 + ETSH/X(B)16P30+50EF
Daikin Altherma 3 H HT ECH₂O
4P679467-1 – 2022.02