Daikin ETSHB16P30EF Installer's Reference Manual page 135

Hide thumbs Also See for ETSHB16P30EF:
Table of Contents

Advertisement

EPRA14~18DAV3+W1 + ETSH/X(B)16P30+50EF
Daikin Altherma 3 H HT ECH₂O
4P679467-1 – 2022.02
In case of high voltage Smart Grid contacts. This requires the installation of the
Smart Grid relay kit (EKRELSG).
The 2 incoming Smart Grid contacts can activate the following Smart Grid modes:
Smart Grid contact
1
0
0
1
1
The use of a Smart Grid pulse meter is not mandatory:
If Smart Grid pulse meter is...
Used
([9.A.2] Electricity meter 2 ≠
None)
Not used
([9.A.2] Electricity meter 2 =
None)
In case of low voltage Smart Grid contacts
Wires (Smart Grid pulse meter): 0.5 mm²
Wires (low voltage Smart Grid contacts): 0.5 mm²
[9.8.4]=3 (Benefit kWh power supply = Smart grid)
[9.8.5] Smart grid operation mode
[9.8.6] Allow electrical heaters
[9.8.7] Enable room buffering
[9.8.8] Limit setting kW
The wiring of the Smart Grid in case of low voltage contacts is as follows:
X 5M
1
7
3
4
5
6
8
a
1
2
S
10
S
S11S
a Jumper (factory-mounted). If you also connect a safety thermostat (Q4L), replace
the jumper with the safety thermostat wires.
S4S Smart Grid pulse meter
1
/S10S Low voltage Smart Grid contact 1
2
/S11S Low voltage Smart Grid contact 2
1 Connect the wiring as follows:
2
0
Free running
1
Forced off
0
Recommended on
1
Forced on
Then [9.8.8] Limit setting kW is...
Not applicable
Applicable
9
10
S S
4
9
Electrical installation
|
Smart Grid operation mode
Installer reference guide
135

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents