6
|
Unit installation
6.3.5 To provide drainage
Installer reference guide
66
±150
kg
2 Fix the unit to the installation structure.
3 Remove the slings (and screws), and dispose of them.
▪
Make sure that condensation water can be evacuated properly.
▪
Install the unit on a base to make sure that there is proper drainage in order to
avoid ice accumulation.
▪
Prepare a water drainage channel around the foundation to drain waste water
away from the unit.
4×
4× M12
4×
EPRA14~18DAV3+W1 + ETVH/X16S18+23DA6V+9W(G)
Daikin Altherma 3 H HT F
4P587502-1A – 2020.01