Wiring Requirements; Installation; Electrical Cabling; Mechanical Installation - GDS 630 CH Installation And Maintenance Manual

Chain slider gate operators
Table of Contents

Advertisement

Keep loose clothing and hands clear of the gate whilst in operation or potentially able to be operated.
The installer should provide all information concerning the use of the automation equipment as well as
instructions regarding the manual override and maintenance procedures to the users of the system.
2.
W
R
IRING
• Single phase 240v 10A non-earth leakage protected power supply to where operator is mounted.
*This is required because inverter VSD drive units inherently allow an earth leakage current to
flow. This current is minimal but a non RCD protected circuit must be installed and the method
of installation done so in accordance AS/NZS 3000:2007 to comply.
A connection made to an earth leakage protected circuit may cause nuisance tripping.
• Extra Low Voltage cables from operator for access control. (Shielded cable if over 8m runs).
3.
I
NSTALLATION DETAILS
After reading the previous sections in this manual, and having checked for suitable installation, proceed as
follows:-

Electrical Cabling

A suitably rated Isolator and 240v power supply should be available near to where the gate operator is to
be mounted. The following diagrams will provide measurements for the positioning of conduits and the
appropriate position for mounting the operator.
When bringing power and control cables into the control enclosure inside the operator,
please leave enough slack in the cables, in this way, the enclosure can still be lifted up in
order to see and work on the controls easier. To lift up control enclosure, undo wing nut
on right hand side, once lifted up, re tighten the nut to keep enclosure in upwards position,
once finished, undo nut, drop enclosure back down, then re tighten wing nut.

Mechanical Installation

• Ensure gate rolls easily and has been installed in a manner where there is no excessive friction or binding
occurring.
• A concrete base approximately 600mm long x 300 wide x 300mm deep should be laid where the gate
operator is to be located.
• IMPORTANT ensure there are gate stops firmly installed in the fully open and closed positions. These
stops need to be engineered and installed such that they will be strong enough to stop the gate should the
limits fail at any time.
• Remove the gate operator cover and position mounting plate and operator in approximate mounting
location.
• Dynabolt or chemical anchor the bottom mounting plate to the concrete mounting pad using 12 x 100mm
fixings.
• Unscrew anticlockwise the manual disconnect knurled knob so the drive gear free wheels.

Electrical Connections

• Connect a non earth leakage protected 10A 240v supply to Din Rail terminals labelled A & N, Connect
earth to the earth Din Rail terminal.
• Conduits for power & control need to preferably come up through 3x25mm holes.
EQUIREMENTS
9

Advertisement

Table of Contents
loading

This manual is also suitable for:

630 ch hd

Table of Contents