GDS 4 Installation And Maintenance Manual

Swing gate operators
Hide thumbs Also See for GDS 4:

Advertisement

Installation and Maintenance Manual
Installation and Maintenance Manual
Installation and Maintenance Manual
Swing Gate Operators
Swing Gate Operators
Models: GDS 4,6,7
Made in Australia from Australian & quality imported components
Made in Australia from Australian & quality imported components
Made in Australia from Australian & quality imported components
A B N
Nov
N14870

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the GDS 4 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for GDS GDS 4

  • Page 1 Installation and Maintenance Manual Swing Gate Operators Swing Gate Operators Models: GDS 4,6,7 Made in Australia from Australian & quality imported components Made in Australia from Australian & quality imported components Made in Australia from Australian & quality imported components...
  • Page 2: Table Of Contents

    CONTENTS Section no: page no: Safety Precautions Specifications Installation Electrical Cabling & Mechanical Installation Electrical Connections Mode Selection Variable Speed Drive Commissioning CB-6 control board layout Schematic wiring diagram Manual release instruction Maintenance details Warranty...
  • Page 3: Safety Precautions

    AFETY RECAUTIONS RECAUTIONS WARNING! FAILURE TO FOLLOW TH FAILURE TO FOLLOW THESE SAFETY PRECAUTIONS AND INSTALLATION NS AND INSTALLATION INSTRUCTIONS COULD RESULT IN INJURY OR D ESULT IN INJURY OR DEATH AND OR DAMAGE TO PROPERT OR DAMAGE TO PROPERTY AND EQUIPMENT •...
  • Page 4: Specifications

    PECIFICATIONS (subject to change without notice) GDS 4 GD 6,7 230v 180w 230v 370w OTOR 100% 100% UTY CYCLE 8-12 sec/90 10-13 sec/90 PEED DJUSTABLE DJUSTABLE WIRING REQUIREMENTS: • 240v on Control Box side. • 3 – 1.5mm cables to each operator (mains voltage plus earth). Must be Shielded Cable.
  • Page 5: Installation

    ECHANICAL NSTALLATION NSTALLATION • Firstly determine which gate rail the operator arm is to be mounted to. Firstly determine which gate rail the operator arm is to be mounted to. • Run a level from the top of the gate rail across to where the operator is to the gate rail across to where the operator is to be installed onto either wall or post.
  • Page 6: Electrical Connections

    LECTRICAL ONNECTIONS Operators:- • Connect the 3 motor wires to the motor terminals plus earth and shielded cable to the earth terminal. • Connect the 3 low voltage limit switch wires to the terminal strip provided. If the run is over 8m and shielded cable is used, connect shield to the earthed chassis.
  • Page 7: Mode Selection

    ELECTION Using the mode selection dip-switches select the desired operating modes. Note the times associated with the parameters marked with an * can be changed. The auto-close times can be changed using the procedure in the following section. See the detailed installation manual for details on how to change the other parameters. Synchronising Delay OSITION OFF - No delay...
  • Page 8: Variable Speed Drive

    Setting Cycle Timers & Auto Close Times The control board has pre-set cycle times which are used to set the maximum time the controller will drive the motors in the open and closed directions. The pre-programmed time for the open and close cycle timer’s is 60 seconds. The control board also has a pre-set pedestrian access time of 5 seconds which is intended to open the motor connected to M1 output only part way.
  • Page 9: Commissioning

    OMMISSIONING Position the gate so it is half way, tighten manual release knob to the point where the gate will just start to be • driven but the clutch will slip if the gate accidentally hits the gate stop too hard while setting up the limits. Power up board and with gate in the half way position, press transmitter or manual control switch so operator •...
  • Page 12: Manual Release Instruction

    ANUAL ELEASE NSTRUCTIONS NSTRUCTIONS • Turn power off to the control box and isolate. Using key to open side door on gate operator cover, Turn power off to the control box and isolate. Using key to open side door on gate operator cover, Turn power off to the control box and isolate.
  • Page 13: Maintenance Details

    AI NTENANCE ETAILS ETAILS WARNING! Failure to maintain equipment may result in injury or death and/or damage to property and equipment result in injury or death and/or damage to property and equipment result in injury or death and/or damage to property and equipment Recommended maintenance to be performed on the operator and gate are as follows: Recommended maintenance to be performed on the operator and gate are as follows:- Operator performs over 150 cycles a day...
  • Page 14: Warranty

    ARRANTY Gate Drive Systems Australia warrants that the goods manufactured by it shall be free from defect in manufacture for a period of 12 months from the date of invoice. Should any fault occur within that period as a result of faulty workmanship or materials, Gate Drive Systems Australia will make all necessary repairs, or at its discretion replace the product at no charge to the Customer except for installation and freight.

This manual is also suitable for:

Gds 6Gds 7

Table of Contents