Wiring Requirements; Installation Details; Plan View/Operator Dimensions - GDS 450 LVL Installation And Maintenance Manual

Commercial sliding gate operator with elsema mcs v2 eclipse operating system
Table of Contents

Advertisement

2.
W
R
IRING
EQUIREMENTS
- The operator can be connected to a suitable 240v a.c 10A power circuit provided it is done so by a
licensed person and rules in AS/NZS 3000:2007 are adhered to.
- The operator can be ordered with separate power supply remote from operator making it easier to run low
voltage to the operator in situations where its difficult or not practical to run 240v ac. Special attention will
have to be made to the wire size used in this case to allow for voltage drop.
- Solar power can be used to power the operator instead of connecting 240v. This unit can be supplied to
run on solar power by special order.
- Conduits preferably need to come through base plate knock out. A plan view diagram is provided below to help
plan the conduit installation positions.
- If extra low voltage control cable runs are over 10m, Shielded cable should be used and the shield connected to the
chassis.
3.
I
D
NSTALLATION
ETAILS
Plan View and Operator Dimensions
4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents