Inspections In Accordance With Din En 50050-2: 2013; Abbreviations - WAGNER PEM-X1 CG Translation Of The Original Operating Manual

Powder cup gun
Hide thumbs Also See for PEM-X1 CG:
Table of Contents

Advertisement

Operating manual Powder Cup Gun PEM-X1 CG
10   Inspections in Accordance with DIN EN 50050-2: 2013
10   INSPECTIONS IN ACCORDANCE WITH DIN EN 50050-2: 2013
If the system is used for electrostatic coating with ignitable coating powders, the test must be
performed in accordance with DIN EN 50050-2: 2013 according to the following Overview Table
[8 46].
10.1   ABBREVIATIONS
ER
Employer
SP
Skilled person
FPE
Fire protection engineer
QEW
Electrician
MFR
Manufacturer
TP
Trained person
Order number 2326960 | Edition 10/2022
FT
Function test
ME
Measurement
SI
Standard inspection
VI
Visual inspection
CM
Continuous monitoring
TI
Technical inspection
45