4.4.2 Setting the Unit

Remove the top and side cardboard panels, the plastic film and
the polystyrene sheets. Remove the lag screws securing the unit to
the shipping skid. Lift the unit off the shipping skid with a forklift
and position it on the floor in the desired location.
9
WARNING: When lifting or moving the boiler: do not attempt
to manipulate the boiler using the top water flanges or any
other component of the boiler.
9
WARNING: When lifting or moving the boiler with a forklift:
make sure the forks are longer than the boiler size (width or
depth) so that the lifting forks stick out as Fig. 5.
Array AR 1000, AR 1500 and AR 2000 Forklift Handling
Fig. 5
If a crane is required, the boiler must be lifted through bands.
9
WARNING: When lifting the boiler with crane: use bands or
straps, no chains. Bands must comply with federal, state and
local rules. The bands must be positioned as shown in Fig. 6.
9
WARNING: When lifting the boiler with crane: the bands must
be positioned according to the Fig. 6 and Fig. 7.
In multiple unit installations, it is important to plan the position
of each unit in advance. Sufficient space for piping connections
and future service/maintenance requirements must also be taken
into consideration. All piping must include ample provisions for
expansion.
31.1"
Fig. 6 Array AR 1000, AR 1500 Crane Lifting Handling
29.5"
Array AR 2000 Crane Lifting Handling
Fig. 7
17
INSTALLATION
FRONT
12.6"
FRONT
12.6"

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Array ar 1500Array ar 1000201773122017731320177314

Table of Contents