SECTION 3 - START SEQUENCE
Start Sequence:
Figure 3-3a: BMK 750 & 1000 Blower Proof Switch
BLOWER
PROOF
SWITCH
BLOCKED
INLET
SWITCH
Figure
5. Upon completion of the purge cycle, the C-More Controller initiates an ignition cycle and
the following events occur:
a) The Air/Fuel Valve rotates to the low-fire (Ignition Position) position and closes the
ignition switch. The Dial on the Air/Fuel Valve (Figure 3-4) will read between 25 and 35
to indicate that the valve is in the low fire position.
OMM-115_D
GF-200
5/9/2019
AIR/FUEL VALVE
OUTLET TO BLOWER
3-3b: BMK 1500 – 3000 Blower Proof Switch
Technical Support • (800) 526-0288 • Mon-Fri, 8 am - 5 pm EST
126
BLOWER PROOF SWITCH
BLOCKED INLET SWITCH
AIR/FUEL VALVE
INLET FROM GAS
TRAIN