Watts Aerco Benchmark OMM-0116 Installation And Start-Up Manual page 47

Natural gas, propane gas and dual fuel fired modulating & condensing boilers
Table of Contents

Advertisement

Benchmark 750-3000 Installation & Startup Manual
SECTION 3 - START SEQUENCE
Start Sequence:
MANUAL
SHUT-OFF
VALVE
Figure 3-1c: BMK 2500: SSOV Location
TO
AIR/FUEL
VALVE
MANUAL
SHUT-OFF VALVE
HIGH GAS PRESSURE
SWITCH
Figure 3-1d: BMK 3000: SSOV Location (P/N 22171 shown)
3. With all required safety device switches closed, a purge cycle will be initiated and the
following events will occur:
a. The Blower relay energizes and turns on the blower.
b. The Air/Fuel Valve rotates to the full-open purge position and closes purge position
switch. The dial on the Air/Fuel Valve (Figure 3-2a and 3-2b) will read 100 to indicate
that it is full-open (100%).
c. The VALVE POSITION bargraph will show 100%.
OMM-115_D
GF-200
5/9/2019
TO
AIR/FUEL
VALVE
Technical Support • (800) 526-0288 • Mon-Fri, 8 am - 5 pm EST
126
NATURAL
GAS INLET
SSOV
LOW GAS
PRESSURE
SWITCH
(P/N 22190 shown)
NATURAL
GAS INLET
SSOV
LOW GAS
PRESSURE
SWITCH
Page 47 of