Watts Aerco Benchmark OMM-0116 Installation And Start-Up Manual page 16

Natural gas, propane gas and dual fuel fired modulating & condensing boilers
Table of Contents

Advertisement

Benchmark 750-3000 Installation & Startup Manual
SECTION 2 – INSTALLATION
WARNING!
Keep the unit area clear and free from all combustible materials and flammable vapors or
.
liquids
FOR MASSACHUSETTS ONLY:
For Massachusetts installations, the unit must be installed by a plumber or gas-fitter licensed
within the Commonwealth of Massachusetts. In addition, the installation must comply with all
requirements specified in Section 1.4, above.
OMM-115_D
GF-200
5/9/2019
NOTE:
Ensure that
condensate
assembly is
not located
over the
housekeeping
pad.
Housekeeping Pad.
Figure 2-1c: BMK 2500/3000 Clearances
Technical Support • (800) 526-0288 • Mon-Fri, 8 am - 5 pm EST
FRONT
126
REAR
Page 16 of

Advertisement

Table of Contents
loading

Table of Contents