Basta Boatlifts 2x2k50 Manual page 14

Over-center hydraulic aluminum lift 2,000 lb capacity per pwc lift
Table of Contents

Advertisement

ASSEMBLY INSTRUCTIONS
Pictured: Step 12
12
12
Bunk Rail Assembly
21+22
PAGE 14
12
12
raise lift to install 1/4 x 1.75" bolts (
JJ
12
KK
21+22
21+22
21+22
Use a small amount of
'moly' lube on bolt
threads through the
assembly process.
Raise lift to install 1/4
x 1.75" bolts ("21").
QTY 4: 1/4 x 1.75" bolts ("21")
QTY 4: 1/4 lock washers ("22")
"15"
)
Placement may need
to be modified based
on watercraft draft and
weather conditions.

Advertisement

Table of Contents
loading

This manual is also suitable for:

2x2k50w

Table of Contents