Planned maintenance
SERIES 1500 LIQUID TURBINE METER
March 2019
7. Install the downstream hanger assembly to the shaft.
8. Install the downstream shaft nut, simultaneously holding the upstream shaft nut to
84
www.Daniel.com
94
Figure 9-12: Downstream cone installation
Figure 9-13: Downstream hanger assembly installation
prevent the shaft from turning.
Daniel Series 1500 Liquid Turbine Meter, NPS 3-24
User manual
P/N 3-9008-515