Chapter 5 Installation Prerequisites; Pre-Start Checks; Torque Information; Tools Required For Lme Disassembly/Assembly - DANIEL 1500 Series User Manual

Liquid turbine meter
Hide thumbs Also See for 1500 Series:
Table of Contents

Advertisement

User manual
SERIES 1500 LIQUID TURBINE METER
P/N 3-9008-515
5
Installation prerequisites
5.1

Pre-start checks

Procedure
1. Inspect all electrical connections to ensure compliance to electrical codes and
2. Inspect all bolts used to secure the turbine meter in line to ensure that correct
3. Evaluate the system setup to ensure that all components are in the correct
4. Ensure that the supply voltage to the preamplifier is within the 10-30 VDC range.
5.2

Torque information

NOTICE
When installing this equipment, bolting must conform to the requirements of ASME B16.5
paragraph 5.3 and to the material requirements of ASME B16.5 Table 1B. Gaskets must
conform to the requirements of ASME B16.20. This is applicable for class 150 to 2500.
Consult factory for higher nominal pressure.
Important
When installing flange, follow the customer's best internal practice procedures.
5.3

Tools required for LME disassembly/assembly

Use the following tools for disassembly/assembly of the turbine meter electronics (LME):
6 mm Allen key
3 mm Allen key
2.5 mm Allen key
3/32 Allen key
10 mm Allen key
Phillips screwdriver
3.5 mm Flathead screwdriver
10 mm Flathead screwdriver
66
www.Daniel.com
User manual
safety regulations.
mounting procedures have been followed and that flange connections are leak-
free.
sequence for accurate product measurement: isolation valve, strainer, flow
straightener, turbine meter, downstream section, control valve, etc.
Installation prerequisites
March 2019