Planned maintenance
SERIES 1500 LIQUID TURBINE METER
March 2019
7. Remove the upstream hanger assembly from the opposite end.
80
www.Daniel.com
90
Figure 9-6: Upstream cone removal
a) To do this you must insert a pin into the hole in the upstream hanger hub.
b) Insert the shaft from the downstream end and push the shaft against the pin.
c) Tap the shaft lightly to free the downstream hanger assembly.
Figure 9-7: Upstream hanger assembly removal
Daniel Series 1500 Liquid Turbine Meter, NPS 3-24
User manual
P/N 3-9008-515