Structural Concepts Oasis B1832H User Manual

Structural Concepts Oasis B1832H User Manual

Self-service, grab-n-go merchandisers / heated shelves / front control panel / ceramic metal halide lights

Advertisement

Quick Links

Oasis
SELF-SERVICE, GRAB-N-GO
MERCHANDISERS / HEATED SHELVES /
FRONT CONTROL PANEL / CERAMIC
METAL HALIDE LIGHTS
Model B3632H
USER MANUALS\20-44626_OASIS_USER MANUAL_B(L)(D)H_B(L)(D)H_HTD_GRAB-N-GO_CASE
READ AND SAVE THESE INSTRUCTIONS
®
MANUAL
Model B2432H
Structural Concepts Corp. ∙ 888 E. Porter Rd ∙ Muskegon, MI 49441 Phone: 231.798.8888 Fax: 231.798.4960 ∙ www.structuralconcepts.com
USER
SCC P/N
20-44626
Important! See Installation
Section Of This Manual For
Specifics On Confirming
Proper Placement of
"Danger-Hot" Labels on
Heated Shelves and Deck
Model B1832H
REV G DATE: 10/14/2022

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Oasis B1832H and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Structural Concepts Oasis B1832H

  • Page 1 Proper Placement of “Danger-Hot” Labels on Heated Shelves and Deck Model B3632H Model B2432H Model B1832H Structural Concepts Corp. ∙ 888 E. Porter Rd ∙ Muskegon, MI 49441 Phone: 231.798.8888 Fax: 231.798.4960 ∙ www.structuralconcepts.com USER MANUALS\20-44626_OASIS_USER MANUAL_B(L)(D)H_B(L)(D)H_HTD_GRAB-N-GO_CASE REV G DATE: 10/14/2022...
  • Page 2: Table Of Contents

    TABLE OF CONTENTS OVERVIEW / TYPE / COMPLIANCE / WARNINGS / PRECAUTIONS / WIRING / PLUGS ...….. INSTALLATION: CASE REMOVAL / POSITIONING & ALIGNING CASE ..………………..……... INSTALLATION, CONTINUED: IMPORTANT! HEATED SHELF LABEL PLACEMENT ..…………… INSTALLATION, CONTINUED: POSITIONING / ALIGNING / REMOVABLE FRONT & REAR PANELS ………...……………………………………………………………………………………….
  • Page 3: Overview / Type / Compliance / Warnings / Precautions / Wiring / Plugs - Page 1 Of 2

    • • These units are designed to merchandise product at an These Structural Concepts cases should be installed and integrated average product temperature of 150 °F (66 °C). operated according to these instructions to ensure proper performance. Improper use will void warranty.
  • Page 4 OVERVIEW / TYPE / COMPLIANCE / WARNINGS / PRECAUTIONS / WIRING / PLUGS - PAGE 2 of 2 PRECAUTIONS POWER CORD AND PLUG MAINTENANCE • • Following are important precautions to prevent Caution! Risk of electric shock. damage to unit or merchandise. Please read carefully! •...
  • Page 5: Installation: Case Removal / Positioning & Aligning Case

    INSTALLATION: CASE REMOVAL / POSITIONING & ALIGNING CASE 2. Remove Case From Skid (Casters) 1. Remove Case From Skid (Levelers) Remove shipping brackets that may be securing • Remove shipping brace that may be securing casters to skid case to skid. •...
  • Page 6: Installation, Continued: Important! Heated Shelf Label Placement

    At least ONE label must be placed on each shelf (as shown below). Wide units may have two or more labels placed on shelves and deck. • If labels are not properly attached, contact Structural Concepts to obtain labels. See SCC TECHNICAL SERVICE CONTACT INFORMATION section at last page in manual. Illustration Shown May Not Exactly Reflect Every Feature or Option of Your Particular Case.
  • Page 7: Installation, Continued: Positioning / Aligning / Removable Front & Rear

    INSTALLATION, CONTINUED: POSITIONING / ALIGNING / REMOVABLE FRONT & REAR PANELS 6. Removable Front & Rear Panels • Front panels are removable by simply sifting up and off (via slot/hook method). See illustration below. • Rear panels are removable by accessing four (4) screws. See illustration below. •...
  • Page 8: Startup: Main Power Switch / Lights Switch / Front Panel Removal

    STARTUP: MAIN POWER SWITCH / LIGHTS SWITCH / FRONT PANEL REMOVAL / ELEC. RACEWAY 1. Front Flip-Down Door / Main Power / Lights • Certain models employ magnets along with slot/ hook method on front/rear panels. • Models have flip-down door with magnet features •...
  • Page 9: Startup, Continued - Control Panel Exploded View (Model B2432H Only)

    STARTUP, CONTINUED - CONTROL PANEL EXPLODED VIEW (MODEL B2432H ONLY) Model B2432H - Control Panel Exploded View 3. Shelves and Deck Heater Controls • Heater controls to shelves and deck are on 1. Field Access Box control panel. • Field access box is at lower-left of control panel. •...
  • Page 10: Startup, Continued - Control Panel Exploded View (Model B3632H Only)

    STARTUP, CONTINUED - CONTROL PANEL EXPLODED VIEW (MODEL B3632H ONLY) Model B3632H - Control Panel Exploded View 3. Shelves and Deck Heater Controls • Heater controls to shelves and deck are on 1. Field Access Box control panel. • Field access box is at lower-left of control panel. •...
  • Page 11: Startup, Continued - Operation And Shutdown

    STARTUP, CONTINUED - OPERATION AND SHUTDOWN (AUTHORIZED PERSONNEL ONLY!) 1. Merchandiser Daily Start-Up (For Authorized Personnel Only) Note: Model B3632H Is • Lift up hinged door at case front. Both switches should be in off position. Shown. General Layout Is •...
  • Page 12: Ceramic Metal Halide Light Fixtures / Replacement / Polycarbonate Heat Shields

    CERAMIC METAL HALIDE LIGHT FIXTURES / REPLACEMENT / POLYCARBONATE HEAT SHIELDS 1. Ceramic Metal Halide Light Fixture Warnings 3. Installation of Ceramic Metal Halide Lamps • Warning! Turn off lights switch before replacing • Wrap new lamp in cloth or paper towel (as ceramic metal halide lights.
  • Page 13: Cleaning Schedule (Daily / Weekly) - Case Exterior

    CLEANING SCHEDULE (DAILY / WEEKLY) - CASE EXTERIOR Cleaning Daily Weekly Task Wood or Laminate Surfaces Case • Clean with warm, soapy water and clean cloth or sponge. Exterior • Dry with clean cloth or paper towel. Insulated Glass • Clean outside surfaces of glass with household or commercial glass cleaner.
  • Page 14: Cleaning Schedule (Daily / Weekly) - Case Interior

    CLEANING SCHEDULE (DAILY / WEEKLY) - CASE INTERIOR Caution! TURN MAIN POWER SWITCH TO “OFF” and allow case to cool at least 45 minutes before cleaning case interior! Cleaning Daily Weekly Task Glass Clean inside surfaces of glass with a household or commercial glass Case cleaner.
  • Page 15: Troubleshooting

    Product is not heating Heating elements may be malfunctioning. at all • Call Structural Concepts Technical Service (at last page of this manual). • Move product to separate location until unit is repaired. Ceramic metal halide Caution! Case is extremely hot! Turn off main power switch and allow lamps are not working lamps to cool for 45 minutes before touching light bulbs.
  • Page 16: Serial Label & Location / Technical Information / Add'l Information

    TECHNICAL SERVICE page in this manual for • Serial labels are affixed at a wide range of places instructions on contacting Structural Concepts’ (on the header, at case rear, behind panels or Technical Service Department. toe-kicks, on electrical boxes, etc.).
  • Page 17: Programmable Controller Information

    PROGRAMMABLE CONTROLLER (SELECT, CLICK ON OR SCAN QR CODE FOR INFORMATION) Determine Which Programmable Controller Is On Your Case (Controllers That Are Commonly Used By Structural Concepts Are Shown Below). Your Particular Programmable Controller May Differ. Carel® ir33 Platform Carel® PJEZ Platform Dixell®...
  • Page 18: Technical Service Contact Information / Warranty Information

    STRUCTURAL CONCEPTS TECHNICAL SERVICE CONTACT INFORMATION & LIMITED WARRANTY YOU MUST HAVE THE FOLLOWING INFO AVAILABLE TECH SERVICE/WARRANTY CONTACT INFO: BEFORE CONTACTING STRUCTURAL CONCEPTS: 1 (800) 433-9490 / EXTENSION 1 SERIAL NO. / MODEL NO. / STORE NO. / STORE...

This manual is also suitable for:

Oasis b2432hOasis b3632hOasis b3632h-4

Table of Contents