Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
8 | Elisa
Emilie
TM
TM

Preparation

UK
Blank headworks
Installation Guide
and Rosa
TM
70-80mm depth
60-70mm depth
Once all stage 1 leak and pressure
1.
tests have been carried out; before
proceeding with the following
instructions, ensure that the built-in
servicing valves are in the closed
position (screwed down).
Remove the pressure testing plates
2.
by unscrewing the bolts with the
long allen key provided.
Ensure all O'rings are installed
and within the grooves of the
valve assembly.
For push button models. Screw
the black extension caps onto the
headworks. (Use the shorter ones
for 60-70mm installation depths
OR the longer ones for 70-80mm
installation depths.)

Advertisement

Table of Contents
loading

Related Products for Elisa Emilie

This manual is also suitable for:

Rosa

Table of Contents