Introduction - Patton SmartNode 4110 Series User Manual

Voip gateway router
Hide thumbs Also See for SmartNode 4110 Series:
Table of Contents

Advertisement

SmartNode 4520 & 4110 Series User Manual
G • Installation checklist

Introduction

This appendix lists the tasks for installing a SmartNode 4520 or 4110 Series router (see
table
15) . Make a copy
of this checklist and mark the entries as you complete each task. For each SmartNode 4520 or 4110 Series
router, include a copy of the completed checklist in your site log.
Table 15. Installation checklist
Task
Verified by
Date
Network information available & recorded in site log
Environmental specifications verified
Site power voltages verified
Installation site pre-power check completed
Required tools available
Additional equipment available
All printed documents available
SmartWare release & build number verified
Rack, desktop, or wall mounting of chassis completed
Initial electrical connections established
ASCII terminal attached to console port
Cable length limits verified
Initial configuration performed
Initial operation verified
Introduction
77

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SmartNode 4110 Series and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Smartnode 4520 seriesSmartnode 4524

Table of Contents