ATH-Heinl ATH Four Lift 64AP User Manual page 99

4-post lift
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 69
Attention
DO NOT continue to push the button when the platforms have reached their full height,
otherwise the motor may be damaged.
2. Press the lowering button to lower the lift completely.
3. Repeat the complete raising and lowering of the stage at least 3 times to vent the trapped air in the cylinder
Note
If the oil level plug is lost or broken, order a replacement. The oil tank must be well vented.
2.10.2.11
Installation of the CE stop switch
1. Raise the lifting platform to a height of 380 mm
2. Mount the CE-Stop switch on the main column and check that it can be operated from the bottom of the
crossbeam.
3. Perform the entire cycle of lowering and raising to verify proper installation and ensure that the alarm is
heard during the final lowering phase. If necessary, adjust the switch by changing the position of the switch
lever.
1
CE stop switch
Shift lever
2.10.2.12 Installation of the height limit switch
1. Raise the lift to a height of 1900mm
2. Install the limit switch on the main column
3. Raise the lift back to a height of approximately 1900mm to verify proper installation of the limit switch.
® Copyright ATH-Heinl GmbH & Co. KG / All rights reserved / Misprints and technical changes reserved
2
Release date: 02.06.2023 / Product manufacturer ATH-Heinl GmbH & Co. KG
99

Advertisement

Table of Contents
loading

Table of Contents