ATH-Heinl ATH Four Lift 64AP User Manual page 94

4-post lift
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 69
At the following points, all columns must be closely observed during the entire process
Press the LIFT button, after a short time the cylinder fills with oil and tightens the lifting ropes
Lift the platform until the crossbars are approx. 50 mm above the trestles or squared lumber.
Align the columns to the crossbeam using a spirit level
Attach a safety anchor to each column for safety reasons
Remove the trestles or squared lumber.
Move the lifting platform to the lowest position by pressing the LOWER button.
Now check the position of the columns again and attach the remaining safety anchors as described in the
next step.
Check the dimensions against the floor plan and make sure that the base plate of each column is flat on the
floor and that the column is aligned squarely
Use the base plate as a guide and drill each hole with a hammer drill
® Copyright ATH-Heinl GmbH & Co. KG / All rights reserved / Misprints and technical changes reserved
94
Release date: 02.06.2023 / Product manufacturer ATH-Heinl GmbH & Co. KG

Advertisement

Table of Contents
loading

Table of Contents