Placing The Library On-Line; Operating Procedures - Quantum ACL 4/52 Operator's Manual

Automated tape library for dlt cartridges
Hide thumbs Also See for ACL 4/52:
Table of Contents

Advertisement

Applying Power to
2
the Library
Placing the Library
2
On-Line
Taking the Library
2
Off-Line
22

Operating Procedures

This section contains procedures for executing the following
operator tasks:
• Applying and removing power
• Placing the library on-line or taking it off-line
• Inserting and removing tape cartridges using the load port
• Manually unloading a tape cartridge from a DLT tape drive
To apply power to the library:
1 Verify the following:
a
Front door and load port closed
b
All outer skins attached
c
All rear panel connections secured
2 At the rear panel, set the AC power switch to the | (on)
position.
3 After several seconds, verify that SDA shows System On-line.
Note: System On-line is only displayed if the library power-up state is
configured for On-line . Otherwise, System Off-line is displayed in
the SDA. (See Chapter 3, "Operator Troubleshooting,")
To place the library on-line:
1 With the library power applied and the SDA showing System
Off-line, press the control panel STANDBY button.
2 Verify that System On-line is displayed in the SDA.
To take the library off-line:
1 With the library power applied and the SDA showing System
On-line, press the control panel STANDBY button.
2 Verify that System Off-line is displayed in the SDA.