3
Turn on the electrical supply to digital mixing valve.
The digital mixing valve will power and perform a self check where the LED will
indicate a RED light initially and will then change to a BLUE/RED flashing light after
a few seconds.
Note: If the LED does not turn to a BLUE/RED flashing light after 10 seconds,
indicating the product is ready to commission, refer to the troubleshooting or
fault diagnosis section.
4
Commissioning Required.
The user controller will indicate commissioning is required with left (A) to right (B)
flashing. Initiate commissioning by pressing the On/Off button ( ) or top button on
dual products. DO NOT leave the product unobserved during commissioning. If you
need to abort the process, press again to 'Cancel', this can be done at any time during
commissioning.
50
Power Indication
LED
A
B