5
Press the button to turn the shower on and reduce temperature to full cold.
6
Run cold water through (approximately 2 minutes) and check entire installation for
water leaks. Press the Controller button to turn the shower off. Fit the second hose
washer and handshower.
7
Press the controller button to turn shower on. Test operation of shower by increasing/
decreasing the temperature.
8
Flush the second outlet for 10 seconds (Overhead or Bath fill). Once complete, fit
and secure the fittings as per instructions in the fittings section.
48