Do a complete MS70 system test.
The tests are described in Setting to work chapter in this manual. They are also provided
in the Harbour Acceptance Test and the Sea Acceptance Test documents.
Setting to work, page 205
Further requirements
Fill in and sign the Installation Remarks form, and send it to Simrad's support department
as specified on the form.

About installation drawings

The installation shipyard must provide all necessary design and installation drawings, as
well as the relevant work standards and mounting procedures.
Note
If required, all documents provided by the shipyard for the physical installation of the MS70
must be approved by the vessel's national registry and corresponding maritime authority
and/or classification society. Such approval must be obtained before the installation can
begin. The shipowner and shipyard doing the installation are responsible for obtaining and
paying for such approval.
Kongsberg Maritime offers free advice for installation planning. Proposed arrangements
may be sent for commentary or suggestions. The following drawings should be submitted
should assistance be requested:
• General arrangement
• Body plan and drawings of the relevant compartment
• Lines plan
Relevant outline dimensions and production drawings can be download from our website.
Most documents are available in PDF and/or AutoCad (DWG) formats.