Sonar Room Requirements; Environmental Requirements - Simrad MS70 Installation Manual

Scientific multibeam sonar
Table of Contents

Advertisement

Preparations

Sonar room requirements

Topics
Sonar room requirements, page 49
Environmental requirements, page 49
Requirement for watertight integrity, page 51
Size and access requirements, page 51
Requirements for insulation, heating and ventilation, page 52
Requirements for electrical installations, cables and communication, page 53
Requirements for bilge pump and decking, page 54

Sonar room requirements

Minimum requirements are provided to obtain suitable working conditions for MS70
installation, use and maintenance.
The sonar room is the compartment in which the Transceiver Unit and the three Power
Supply Units are installed.
Note
It is strongly recommended to use a dedicated compartment to house these units. They must
also be installed relatively close to each other due to the limited length of the cables.
Related topics
Installation summary, page 41
Installation principles, page 45
Sonar room requirements, page 49

Environmental requirements

The MS70 units must be installed in a dry and dust-free environment. The units are not fully
protected against humidity, dust or water.
It is important that the sonar room is kept dry. The MS70 units must not be exposed to
excessive temperatures, moisture or humidity. Such conditions can cause corrosive attacks
and subsequent failures to the electronic circuitry. Visit the sonar room at regular intervals
49
331549/C

Advertisement

Table of Contents
loading

Table of Contents