Installation; Main Switch - Ecoflam BLU TS 3000.1 PRE HT Manual

Table of Contents

Advertisement

INSTALLATION

Fitting the burner to the boiler
!
WARNING: handling and moving operations must be carried out by specialised personnel.
Use the eyebolts to lift the burner in order that it will not overturn and fall down.
To perform the installation of the burner
into the boiler drill the boiler plate
according to the dimension given on this
manual and place the burner towards it by
lifting and moving the burner by means of
eyebolts.
Place the gasket on the burner flange and
install the burner into the boiler by fixing
nuts into the bolts.
The space between the blast tube and the
boiler lining must be sealed with
appropriate insulating material.
BURNER LINING
Check before burner installation:
1. Depending on the type of boiler
(reverse
flame or three pass) check the burner
blast
tube installation depth according to the
data specified by the boiler manufacturer
or consult the burner producer.
2. Check the ignition electrodes on the
burner head as per factory setting (see
figures).
The setting of the mixing and ignition unit
according to the boiler output will be
performed during commissioning
procedure.
3. Check that the head is preset at 50%.
MAIN SWITCH
I
0 - OFF
0
1 - ON
420010717300
Position of the electrodes
Ignition Electrode
Elettrodo di accensione
www.ecoflam-burners.com
EN
7 mm
4 mm
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Blu ts 4000.1 pre ht

Table of Contents