Powering The System Up; Commissioning The Battery Backup System At The Router - ASL INTERCOM BPC130 Series Product Manual

Battery pack, charger, battery and mains distribution
Table of Contents

Advertisement

3.4.1.6

Powering the system up

23.
Connect the AC mains supply to the charger.
24.
Wait for the batteries to fully charge (24 hours) and then switch the Mini Circuit Breakers on as
required.
3.4.1.7

Commissioning the Battery Backup System at the Router

25.
Commission the BPC130 as described in Section "5 Commissioning" (page 22).
BPC130 / BDIST / MDIST – Product Manual
U-0456-0145.doc – Issue: 04 complete, approved
Page 16 of 40