Pri Startup - Nortel Communication Server 1000 Maintenance Manual

Isdn primary rate interface maintenance
Hide thumbs Also See for Communication Server 1000:
Table of Contents

Advertisement

30 Quick reference to PRI operations
Table 8
Procedure 4PRI status check (cont'd.)
Step
Action
PRI to DCHI cable
E1/T1 transmission cable from
NT8D72AA to DSX (the digital cross
connect)

PRI startup

This procedure provides the steps required to take the PRI and DCH from
a disabled to an operational state.
Table 9
Procedure 5
PRI status check
Action
Step
1
Check the status of all PRI cards.
2
If any other LEDs are lit, go to PRI fault
clearing.
3
Test all PRIs using:
LD 60
DISL loop
SLFT L
Copyright © 2003-2009 Nortel Networks
.
Nortel Communication Server 1000
ISDN Primary Rate Interface Maintenance
NN43001-717 03.01
11 May 2009
Response
Response
The PRI shown is disabled.
SLFT OK