3 Securing the Device
3.3 Validating Setup Configuration
3.3 Validating Setup Configuration
After installing ERX350 on the meter and updating its configuration settings, ensure to perform the
following final checkout tasks:
Verify the pulse input. Refer to the section
l
Verify pressure/temperature factors. Refer to the section
l
Temperature".
Honeywell
2023
"Testing the Pulse
Input".
"Verifying
Pressure" or
"Verifying
48