Continuity Test - AEMC 205 User Manual

Power clamp-on meter
Table of Contents

Advertisement

3.6

CONTINUITY TEST

Warning: Before performing the test, make sure that the circuit is off and all
capacitors have been discharged.
1.
Set the switch to
2.
Connect the black lead to the COM terminal and the red lead to the "+"
terminal.
3.
Connect the test probes or the alligator clips to the circuit or component
to be measured.
An audible signal is emitted if there is continuity (resistance value is below the
maximum threshold - see § 3.4.1) and the measured value is displayed on the
screen.
; the
symbol is displayed.
23

Advertisement

Table of Contents
loading

Table of Contents