Floor Mounting the Unit
Step 1: The unit has 44 x 12mm deep
fixing holes on the underside suitable
for a No.6 screw. Pre drill a board using
the dimensions shown, and cut 2 x
105mm minimum diameter holes for the
condensate drain access.
Step 2: Mount the board to the
underside of the unit using appropriate
fixings.
Note: Ensure any other cabling
requirements (e.g. sensor, control
cables etc) are routed through the two
cable channels as required prior to
attaching the board.
The board may then be attached to
joists, flooring, or equivalent.
Vent-Axia recommend that where
possible, the wall bracket is used in
conjunction with any floor mount
solution to prevent the unit from tipping.
Step 3: Mark the wall bracket position
using the dimensions shown. Note the
position of the top of the unit in relation
to the wall bracket. Ensure the bracket
position is parallel to the floor.
Step 4: Attach the wall bracket to the
wall or batten using appropriate fixings.
(As shown on page 19)
Step 5: Lift the unit and locate the two
hooks on the rear onto the wall bracket
prior to fixing the unit to the floor. (As
shown on page 19)
MVHR Installation and User Guide 476930
Installation
Base fixing
holes 11 x 4
Top of unit
21