Operation Of Ground Spreader - Vinten V4160-0001 User Manual

Table of Contents

Advertisement

3.
Bend the rubber strap
1
and engage the bottom edge of the
lever in the tripod recess.
4.
Lift the lever
2
upwards towards the tripod until it locks in place.
Repeat for all three legs.
5.
Tripod spiked foot secured in the Ground Spreader Foot.
2
1

Operation of Ground Spreader

1.
When assembled on the tripod, use your foot to press and hold
the arm release button (as below).
2.
Extend the inner arm to the required length and release the
button. (There are a total of 12 positions).
NOTE! The inner arm should not be forced back against
the mechanism, always hold the release button down
whilst extending or retracting the inner arm.
The inner section has distance markers (as shown below), this helps
to visually set the length of the spreader arms.
Release Button
If the spreader will not go into the desired position, check
the tripod Hinge Lock is in the OFF (spreader mode)
position for use with a spreader. (See page 14 for lock
operation).
Installation
Inner Arm
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Flowtech 100Flowtech 75V4150-0001

Table of Contents