Assembly Of Equipment - HK SIEVE Series Installation, Maintenance And Operation

Table of Contents

Advertisement

3.4.1 ASSEMBLY OF EQUIPMENT (IF NECESSARY)
Complete list of assembly instructions listed below.
Steps
1
Disconnect all power to the unit before trying to adjust parts
2
Notice the housing of this unit is prefabricated. Make sure the unit is placed in a clear desig-
nated area after assembly
3
Notice the lock nuts and vibration mounts are to be screwed into the base plate before bolt-
ing to the housing, jam nuts will be tightened and fixed accordingly after installation
4
Start by threading bolt and washer into the feet and base plate, torque bolts after threading.
Set the feet with base plate onto flat surface
5
Thread lock nuts onto each side of the dampeners before threading assembled parts into
base plate
6
Thread the three rods onto the assembled dampeners
7
Thread studs into the ends of the rods
8
Notice on the inside of the housing is a welded plate. The RES-1-2 Rotary Electric Vibrator
must be aligned with the bolt holes. Orient the rotary electric vibrator length wise direction,
vertically, before torquing the vibrator mount fastener and nut assembly to the motor plate.
Make sure the cord is leading out of the hole in the housing before securing the knurled
piece to the housing
9
Now that the vibrator is installed, align the holes of the housing with the studs. Place studs
into the housing holes before tightening the nuts
10
The product delivery funnel should sit on the housing with the spout pointing out of the
hole in the side of the housing and downwards
11
The ultrasonic rim should seat within the funnels out lip with the screen down onto the base
assembly with gaskets around outside edges. The band clamp will be placed around the rim,
funnel lip and housing groove. See section 5.1.2 to find the workings of the clamp and how to
attach and un-attach it
12
Please check that the contact surfaces of the booster to rim and horn to booster are clean of
dirt, dry and polish before connecting
13
An M8 stud should come with the unit, it will be threaded halfway into the hole on the outer
edge of the rim. After threading the stud attach the ultrasonic booster to rim and with a
spanner wrench torque to 180 inch pounds
14
A ½" stud should come with the unit, it will be threaded halfway into the hole at the back of
the booster. After threading the stud attach the ultrasonic horn to the booster and torque to
180 inch pounds
15
The rotary motor switch box will be preassembled and found within the preassembled unit
or it can be found attached to the metal from
16
Connect cord to power before starting
12

3.4.1 Assembly of Equipment

Action
WE MAKE SIFTING OPERATIONS
BETTER.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hk-8Hk-12Hk-17

Table of Contents