Huawei UPS5000-E-60 kVA User Manual page 31

Hide thumbs Also See for UPS5000-E-60 kVA:
Table of Contents

Advertisement

UPS5000-E-(60 kVA-125 kVA)
User Manual (Integrated UPS 3.0)
Drilling Holes
Issue 04 (2022-12-30)
Ensure that the angle between two hoisting ropes is no more than 90
degrees, as shown in the following figure.
Obtain consent from the customer and contractor before drilling holes.
Wear protective equipment such as safety goggles and protective gloves when
drilling holes.
To avoid short circuits or other risks, do not drill holes into buried pipes or
cables.
When drilling holes, protect the equipment from shavings. After drilling, clean
up any shavings.
Copyright © Huawei Digital Power Technologies Co., Ltd.
1 Safety Information
23

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ups5000-e-125 kva

Table of Contents