Ricoh A-P3 Service Manual page 41

Table of Contents

Advertisement

BRIDGE UNIT FOR MAILBOX INSTALLATION (G912)
[A]
G912I501.WMF
[F]
G912I508.WMF
11. Pull up the tab [A] of the protective sheet.
NOTE: 1) Do not remove the protective sheet at this time.
2) Make sure that all mylars are held between the two folded halves of
the protective sheet.
12. Turn over the bridge unit [B] and insert the protective sheet [C] into the gap [D]
between the paper guides, then put the bridge unit on the mailbox [E].
NOTE: When holding the bridge unit, do not touch the timing belt. Otherwise
the timing belt may come off the gear.
13. Remove the tape [F] for the protective sheet.
14. Open the upper paper guide [G] then pull out the protective sheet [H].
NOTE: Check that all mylars are set into the gap between the paper guides.
[D]
[G]
[H]
1-30
[H]
6 November, 2001
[B]
[C]
[E]
G912I507.WMF

Advertisement

Table of Contents
loading

This manual is also suitable for:

G065

Table of Contents