Figure 10.3-3 Fix the modules
Note that after the module is installed, the insulation cap of the module
should be kept, and it may be used for maintenance operations

10.4 GBMS installation

Figure 10.4-1 Step 1 - Place GBMS on the installation location
SHENZHEN CENTER POWER TECH CO., LTD
Address: Rooms 9-12, 7F, Block B, Building 7, Zone 2, Shenzhen Bay Technological and
Ecological Park, Nanshan District, Shenzhen, China
Tel: 0755-66851118 Fax: 0755-66850678 Email: sales@vision-batt.com