9 System installation
9.1 Unpacking and inspection
REVO lithium battery system has passed the strict and comprehensive testing and quality
examination before being put into use. Please make a detailed inspection of the products before
accepting the goods. If anything is damaged, please contact Vision and provide details.
Suggestions for inspection are as follows:
Please check whether the package is intact.
Please check the quantity and type of products on the packing list.
Please check whether the equipment (including modules, CBMS, GBMS, etc.) inside
the package is intact. The cabinet and battery modules are shipped separately.
9.2 Unpacking steps
Figure 9.2-1 Step 1: Overview of the packing
SHENZHEN CENTER POWER TECH CO., LTD
Address: Rooms 9-12, 7F, Block B, Building 7, Zone 2, Shenzhen Bay Technological and
Ecological Park, Nanshan District, Shenzhen, China
Tel: 0755-66851118 Fax: 0755-66850678 Email: sales@vision-batt.com
Green Our Earth
Power Your Vision
37