System Installation; Unpacking And Inspection; Unpacking Steps - Vision REVO User Manual

Lithium battery system
Hide thumbs Also See for REVO:
Table of Contents

Advertisement

9 System installation

9.1 Unpacking and inspection

REVO lithium battery system has passed the strict and comprehensive testing and quality
examination before being put into use. Please make a detailed inspection of the products before
accepting the goods. If anything is damaged, please contact Vision and provide details.
Suggestions for inspection are as follows:
 Please check whether the package is intact.
 Please check the quantity and type of products on the packing list.
 Please check whether the equipment (including modules, CBMS, GBMS, etc.) inside
the package is intact. The cabinet and battery modules are shipped separately.

9.2 Unpacking steps

Figure 9.2-1 Step 1: Overview of the packing
SHENZHEN CENTER POWER TECH CO., LTD
Address: Rooms 9-12, 7F, Block B, Building 7, Zone 2, Shenzhen Bay Technological and
Ecological Park, Nanshan District, Shenzhen, China
Tel: 0755-66851118 Fax: 0755-66850678 Email: sales@vision-batt.com
Green Our Earth
Power Your Vision
37

Advertisement

Table of Contents
loading

Table of Contents