Maintenance And Repairing; Safety Notice - Vision REVO User Manual

Lithium battery system
Hide thumbs Also See for REVO:
Table of Contents

Advertisement

3.3.8

Maintenance and repairing

After disconnecting the energy storage battery cabinet and UPS, confirm the
disconnection again before opening the front door for maintenance or overhaul.
In the maintenance and overhaul, the following items should be concerned:
 Each operation must be carried out by expert users or by skilled users under
the supervision of expert users.
 Ensure that the energy storage battery cabinet is not accidentally recharged.
 Ensure no electricity in the energy storage battery cabinet with a Multimeter.
 Insulate the possible electric part of REVO with insulation materials. Insulate
the positive and negative terminal of the battery module with insulating tape.
 Ensure necessary ground connection.
3.3.9

Safety notice

HAZARD OF ELECTRIC SHOCK, EXPLOSION, OR ARC FLASH
Read all instructions in the manual before installing or working on this product.
Failure to follow these instructions will result in death or serious injury.
DANGER
SHENZHEN CENTER POWER TECH CO., LTD
Address: Rooms 9-12, 7F, Block B, Building 7, Zone 2, Shenzhen Bay Technological and
Ecological Park, Nanshan District, Shenzhen, China
Tel: 0755-66851118 Fax: 0755-66850678 Email: sales@vision-batt.com
Green Our Earth
Power Your Vision
15

Advertisement

Table of Contents
loading

Table of Contents