Module Installation - Vision REVO User Manual

Lithium battery system
Hide thumbs Also See for REVO:
Table of Contents

Advertisement

Figure 10.2-2 Ground(PE) connect

10.3 Module installation

Install the main control CBMS and the battery modules from bottom to top on the specified
cabinet, and
fix modules on the cabinet with cross head bolts with screw bolts provided with 7 Nm,
as shown below
Pay attention to the weight of the module during transportation.
This operation must be carried out by at least two skilled users
SHENZHEN CENTER POWER TECH CO., LTD
Address: Rooms 9-12, 7F, Block B, Building 7, Zone 2, Shenzhen Bay Technological and
Ecological Park, Nanshan District, Shenzhen, China
Tel: 0755-66851118 Fax: 0755-66850678 Email: sales@vision-batt.com
Green Our Earth
Power Your Vision
58

Advertisement

Table of Contents
loading

Table of Contents