Vision REVO User Manual page 97

Lithium battery system
Hide thumbs Also See for REVO:
Table of Contents

Advertisement

Step 4: Start the cabinets. Check the self-check status of all cabinets when powered on
separately.
Step 5: When the self-check is successful, a sound will appear, and the indicator light will
turn green and keep on. Proceed to step 6.
1.
If self-check fails, the indicator will keep red on. If the self-test fails, you need
to check it.
2.
Is it determined that it is the cell voltage/temperature/communication
failure/CBMS parameter?
3.
The alarm information can be observed on the monitor and display screen
4.
Detect and repair voltage/temperature/communication faults, return to step 3
and retest in order
Step 6: Close all battery cabinets
Step 7: Cold start
Step 8: Start each battery cabinet CBMS
Step 9: Start GBMS
Step 10: Check whether the CBMS parameters are completely consistent/GBMS
parameter setting are reasonable. If it makes sense, go to the next step. If it doesn't,
recheck and make changes.
Step 11: Check the dry contacts and verify that are reasonable. If it makes sense, go to the
next step. If it doesn't, re-check and confirm the cause (Contact our technical to redefine
dry contacts)
Step 12: Check whether the communication is normal, if it makes sense, go to the next
step. If it doesn't, check the register configuration and verification and retest.
Step 13: Test the backup time
SHENZHEN CENTER POWER TECH CO., LTD
Address: Rooms 9-12, 7F, Block B, Building 7, Zone 2, Shenzhen Bay Technological and
Ecological Park, Nanshan District, Shenzhen, China
Tel: 0755-66851118 Fax: 0755-66850678 Email: sales@vision-batt.com
Green Our Earth
Power Your Vision
97

Advertisement

Table of Contents
loading

Table of Contents