Vision REVO User Manual page 94

Lithium battery system
Hide thumbs Also See for REVO:
Table of Contents

Advertisement

Check whether the battery cabinet is installed neatly, and the cabinet is fixed without shaking and
displacement.
Check the battery power and the tightness of the signal cable fixing screw and cable insulation
performance
Check whether the positive and negative terminals of the battery are connected correctly, and the labels at
the cable terminals are clear and correct.
Check whether the fixed screws of each function module in the battery cabinet are tightened.
Whether the door panel of the battery cabinet and the air inlet of the function module have been dusted and
the civil construction of the machine room has been completed.
Check whether the battery module fan rotates normally and is not blocked by foreign matter.
For a parallel cabinet system, check the correct polarity of the battery lines from the single cabinet to the
bus box.
Iron filings, copper wires and other metal foreign bodies in the cabinet during installation have been
cleaned up.
Check whether the battery cabinet is reliably grounded and the tightness of the grounding wire fixing
screw.
Check whether the terminal resistance & dial the code address is correct.
Verify the control wiring between the battery and the UPS.
The temperature and humidity of the machine room meet the requirements of the product power on
operation specifications.
Verify the proper battery settings as supplied by engineering and/or related parameters setting.
Make sure the boot sequence is correct.
SHENZHEN CENTER POWER TECH CO., LTD
Address: Rooms 9-12, 7F, Block B, Building 7, Zone 2, Shenzhen Bay Technological and
Ecological Park, Nanshan District, Shenzhen, China
Tel: 0755-66851118 Fax: 0755-66850678 Email: sales@vision-batt.com
Green Our Earth
Power Your Vision
94

Advertisement

Table of Contents
loading

Table of Contents