Monitoring - Salicru EQUINOX EQX2 4002-HT User Manual

Three-phase hybrid solar inverters connected to the grid
Table of Contents

Advertisement

Available languages

Available languages

Once all the values have been entered, press the "Create plant"
button.
Next, the app will indicate that the plant has been successfully
created by means of a message at the bottom and a new header
will appear in the "My plants" panel:

7.6.3. Monitoring.

This monitoring mode only works during the hours of solar
irradiance in which the inverter is running.
While the inverter is off, the app will not receive generation or
consumption data.
7.6.3.1. Electrical diagram of the installation.
Make sure that the installation is as shown on the diagram in
section "5.4. Installation of the monitoring device."
7.6.3.2. Configuring the installation/plant in
the app.
The inverter must be powered throughout the process.
Click on the plant that has been created to access its details:
For the time being, only the power of the solar
field that has been entered will be displayed
because the measurement instruments are not yet
connected; this will be shown with the "Devices
offline" message on the top of the synoptic chart.
Add a  device to the plant that has been created: press the
"properties" button [ ], to the right of the plant title.
USER MANUAL
EQX2 SOLAR INVERTERS CONNECTED TO THE GRID
95

Advertisement

Chapters

Table of Contents
loading

Table of Contents