Installation - Veris Industries E31 Series Installation Manual

Branch circuit power meter with split-core cts
Table of Contents

Advertisement

E31 Series Installation Guide

Installation

Z205667-0G
Page 10 of 23
Alta Labs, Enercept, Enspector, Hawkeye, Trustat, Aerospond, Veris, and the Veris 'V' logo are trademarks or registered trademarks of Veris Industries, L.L.C. in the USA and/or other countries.
Observe handling precautions for static sensitive
devices to avoid damage to the circuitry which
would not be covered under the factory warranty.
Disconnect and lock out power to the electrical panel.
1. Install the acquisition board mounting bracket in the panel. Panels can be oriented side-by-side (Figure 1A) or vertically (Figure
1B). A grounding connection is located on the mounting bracket, near the lower right corner.
The protective ground connection on the mounting bracket should be used if the E31 will
not be mounted to a suitably grounded surface. Assure conductivity to the protective
ground.
Figure 1A
Panel 1
Panel 2
Adapter boards
Figure 1B
Panel 1
Panel 2
Adapter boards
©2015 Veris Industries USA 800.354.8556 or +1.503.598.4564 / support@veris.com
Other companies' trademarks are hereby acknowledged to belong to their respective owners.
Main Circuit Board
TM
Ground
0815

Advertisement

Table of Contents
loading

Table of Contents