E31 Series Installation Guide
Installation (cont.)
Figure 4
Note: If the signed power factor feature is NOT enabled, then the current sensor orientation
does not affect meter behavior. If this feature IS enabled, orient the current sensors so that
the arrow points toward the load for proper operation.
Z205667-0G
Page 12 of 23
Alta Labs, Enercept, Enspector, Hawkeye, Trustat, Aerospond, Veris, and the Veris 'V' logo are trademarks or registered trademarks of Veris Industries, L.L.C. in the USA and/or other countries.
4. Connect current sensors to the terminals on the adapter boards (Figure 4).
5. Install the current sensors onto the conductors to be monitored (Figure 5). Note: Clean split-core contacts before closing. The
hinge can detach, allowing the base and the top to separate for easier cleaning and installation.
Figure 5
The 50 A CT accepts a maximum #2 AWG (0.384" O.D.) wire with THHN insulation.
The 100A CT accepts a maximum 3/0 AWG (0.584" O.D.) wire with THHN insulation.
The 200A CT accepts a maximum of 350 MCM wire with THHN insulation.
Use this gauge wire or smaller for each circuit.
©2015 Veris Industries USA 800.354.8556 or +1.503.598.4564 / support@veris.com
Other companies' trademarks are hereby acknowledged to belong to their respective owners.
A
Panel 1
Panel 1
B
place to ensure that contact surfaces
TM
Align ribbon cable key with
connector keyhole.
A
Panel 2
B
Close CTs until the clasp clicks into
are firmly seated.
0815

Advertisement

Table of Contents
loading

Table of Contents