Veris Industries E31 Series Installation Manual page 14

Branch circuit power meter with split-core cts
Table of Contents

Advertisement

E31 Series Installation Guide
Installation (cont.)
Z205667-0G
Page 14 of 23
Alta Labs, Enercept, Enspector, Hawkeye, Trustat, Aerospond, Veris, and the Veris 'V' logo are trademarks or registered trademarks of Veris Industries, L.L.C. in the USA and/or other countries.
Figure 8
A
Panel 1
B
Panel 1
Mains
Voltage taps are
shared by both panels
Panel 1 uses base Modbus address as set by DIP switches.
Panel 2 uses base + 1 Modbus address as set by DIP switches.
8. Configure communication and addressing parameters using DIP switches. The E31 requires two addresses, one for each set of
42 current sensors and four auxiliary inputs. See the Configuration section for more information.
Aux CT Installation
1. Connect 0.333 Vac current transducers (CTs) to the mains or other conductors, observing local codes regarding bending radius
(optional; Figures 9, 10). Refer to the appropriate CT installation instructions for further information.
Figure 9
Panel 1
Panel 2
Recommended CT:
Veris Industries H6810, H6811, H6812 Series with 0.333 Vac output.
Available in 100 A max. to 2400 A max.
Call a Veris sales rep if higher amperages are required.
©2015 Veris Industries USA 800.354.8556 or +1.503.598.4564 / support@veris.com
Other companies' trademarks are hereby acknowledged to belong to their respective owners.
A
Panel 2
B
Panel 2
Mains
TM
0815

Advertisement

Table of Contents
loading

Table of Contents