Wiring Diagram; Equipment Required For Leister Repair Service; Mobile Equipment; Installed Equipment - Leister GHIBLI AW Repair Instructions

Hot air tool
Hide thumbs Also See for GHIBLI AW:
Table of Contents

Advertisement

Leister Technologies AG

15 Wiring diagram

e-Drive
L1 brown
100...230V
N blue

16 Equipment required for Leister repair service

16.1 Mobile equipment

 1 protective earth conductor tester
 1 high voltage tester up to 4000V
 1 temperature meter with temperature measurement probe
 1 multimeter with following measurement options:
- Current
- Voltage
- Resistance
- Continuity (test buzzer)
 1 rotational speed meter
 1 water column
 1 soldering iron
 1 complete set of tools (screw drivers etc.)

16.2 Installed equipment

 ESD-protected working environment
 Transformer, possibly separated into variable and isolating transformer
Data:
 3 built-in voltmeters (500V)
 3 built-in ammeters (30A) or wattmeters
Repair instructions
HMI 05
3
PTU 04
M
Motor B 47/25
3 x 0..500V
3 x 30A
Ghibli AW
Revision: B
Print adapter front 100...230V
black
pink
grey
green
L1 brown
N blue
QM
INN_FO_29
Page
45 / 48
Created
13.04.15 PRI
Released
20.04.15 PRI
Modified
02.07.18 PRI
Heating
element
L1
L2
N
HCU 41
Thermocouple
type K
green
white
(e.g. Elabo)
(e.g. Elabo, Korntal)
(e.g. Fluke, Testo)
(e.g. Fluke)

Advertisement

Table of Contents
loading

This manual is also suitable for:

1411191700

Table of Contents