Chapter 4 Grounding - Emerson Micro Motion Installation Manual

Fork viscosity meters
Hide thumbs Also See for Micro Motion:
Table of Contents

Advertisement

4
Grounding
The meter must be grounded according to the standards that are applicable at the site.
The customer is responsible for knowing and complying with all applicable standards.
Prerequisites
Micro Motion suggests the following guides for grounding practices:
If no external standards are applicable, follow these guidelines to ground the meter:
CAUTION!
Ground the meter to earth, or follow ground network requirements for the facility. Improper
grounding can cause measurement error.
Procedure
Check the joints in the pipeline or tank installation.
-
If the joints in the pipeline or tank are ground-bonded, the meter is automatically
grounded and no further action is necessary (unless required by local code).
-
If the joints in the pipeline or tank are not grounded, connect a ground wire to the
grounding screw located on the meter electronics.
Installation Manual
In Europe, EN 60079-14 is applicable to most installations, in particular Sections
12.2.2.3 and 12.2.2.4.
In the U.S.A. and Canada, ISA 12.06.01 Part 1 provides examples with associated
applications and requirements.
For IECEx installations, IEC 60079-14 is applicable.
Use copper wire, 18 AWG (0.75 mm
Keep all ground leads as short as possible, less than 1 Ω impedance.
Connect ground leads directly to earth, or follow plant standards.
2
) or larger wire size.
Grounding