Appendix A: Forms and Check Sheets
The following forms and check sheets are included for use
with Trane start-up of CDHH CenTraVac™ chillers. Forms
and check sheets are used, as appropriate, for installation
completion verification before Trane start-up is scheduled,
and for reference during the Trane start-up.
Where the form or check sheet also exists outside of this
publication as standalone literature, the literature order
number is also listed.
CTV Form — Installation Completion and Request for
Trane Service (CTV-ADF001*-EN)
CenTraVac Chiller Start-up Tasks to be Performed by
Trane
CenTraVac Chiller Annual Inspection List
CDHH-SVX003C-EN
CenTraVac Operator Log

Unit Start-up/Commissioning

Important: Start-up must be performed by Trane or an
agent of Trane specifically authorized to
perform start-up and warranty of Trane
products. Contractor shall provide Trane (or an
agent of Trane specifically authorized to
perform start-up) with notice of the scheduled
start-up at least two weeks prior to the
scheduled start-up.
®